Formwork Estimating — Australia-Wide

Tender-ready formwork estimates. Delivered in 3–5 days.

Item-level takeoffs, priced BOQs, and labour-modelled estimates for concrete subcontractors, builders, and developers across Australia.

3–5 days

Standard turnaround

100%

Item-level takeoffs

Australia-wide

Coverage

§ 01FORMWORK ESTIMATING

The takeoff that wins the tender — and survives the pour.

Formwork is where concrete projects make or lose their margin. Every cycle, every prop, every specified finish has a cost that standard estimating software rounds away. HYKSOS reads the drawings like a foreman — and builds a quantity model the site team actually recognises.

Reinforcement steel cage inside concrete formwork panel on active construction site
Commercial · Civil · Residential
Scope of works
  • Wall, column, slab & soffit formwork quantities
  • Suspended slab tables, drop heads, props & bracing
  • Column & core formwork cycles and re-use tracking
  • Custom & feature-finish formwork with finish schedules
  • Rebar and mesh supply / fix quantities (where required)
What you receive
Item-level takeoff
Excel / CSV
Marked-up drawings
PDF overlays
Bill of quantities
Trade-formatted
Tender summary
Executive 1-pager
Send us your drawings
§ 04HOW WE WORK

A process built for tender week.

Most engagements run four to ten days end-to-end. Rush tenders can be delivered in 48–72 hours when drawings are in hand.

  1. 01

    Brief & drawings

    Send drawings, specs and any existing schedules. We confirm scope, timeline, and commercial sensitivity — often within the same day.

  2. 02

    Quantification

    We perform a measured takeoff directly from your drawings. Every quantity is traceable back to a marked-up PDF or model — no black-box numbers.

  3. 03

    Pricing & labour model

    Rates are applied from your own pricing book where provided, or from our reference rates. Labour hours and cycle times are modelled against your crew.

  4. 04

    Review & handover

    A working session with your estimator or PM to walk through assumptions, sensitivities and scope gaps. You leave with a tender-ready pack.

§ 05.5SOCIAL PROOF

What our clients say.

"HYKSOS delivers takeoffs we can actually rely on. Their formwork estimates are detailed, defensible, and they turn them around fast. We have used them on projects from $2M to $50M and the accuracy is consistently within 2-3%. That is the difference between winning on margin and losing on scope."

Charbel Dib

CYD FORMGROUP

"As a Tier 2 builder, we need estimates we can hand to clients without rework. HYKSOS includes everything — labour, materials, plant, methodology — in one pack. Their engineering sign-off on formwork systems saves us weeks of coordination with consultants."

Lawrence Sahyoun

FASTFORM AUSTRALASIA

"We have engaged HYKSOS for full construction estimates on mixed-use and residential projects. What sets them apart is they understand the trade — they ask the right questions upfront, flag risks early, and their numbers hold up through tender and construction. That is rare."

Daniel

DANA M GROUP

Send us the drawings. We'll send back a number you can defend.

Tell us what you need estimated, attach a link or upload your drawing pack and we'll come back with scope, price and timing — usually same day.

[email protected]0421 125 249
Unit 23/1017 Canley Vale Rd
Wetherill Park NSW 2164
Your drawings stay confidential.